top of page


Kai Tyner's Yokai: Design Log
Hello everyone, I hope you're all doing well. I'm back with another blog post regarding the design of our newest release the Yokai. This is the "second" release from Dreamcraft and was designed as a signature model for one of our members Kai Tyner. (Sagane isn't actually released quite yet) It's been a while since we've released something, as there was a lot of personal life things going on in my life over the past few years. Recovering from some of these things took a littl
-
Oct 2511 min read


Design Log : Asora v03 Year in Recap
Thank you to everyone who picked up Asora. It truly means so much to me to see people buy and enjoy Asora. I've spent nearly 3 years on...
-
Jul 29, 202510 min read


Design Log : Asora packaging.
I've said this before, but 01 and 02 were me dipping my toes in the water. I have a vision, but it's not quite clear until you actually...
-
Jul 22, 20249 min read


Design Log : Asora v.03 recieved
Asora has arrived and I couldn't be more excited to share it with you all. First up, here's some of the artwork I made for this version's...
-
Jul 13, 20248 min read


Design Log : Asora v.03
After many years, we've finally arrived. If you haven't yet, read the previous design logs that go over the intial design thought process...
-
Apr 3, 202414 min read


Design Log : Steel SE Mono (SES)
Dreamcraft's Second Design : "SES" Prototype. When I started Dreamcraft, the whole goal was to design throws that I felt were something...
-
Feb 21, 20246 min read


Design Log : Asora Year in Review
This will be a long entry, please strap in. If you haven't already, please view my design notes for the two versions of Asora. It...
-
Feb 9, 20249 min read


Launching a brand, Selling and designing a yoyo, the aftermath.
Launching this yoyo was us dipping our toes in the water to get a feel for running a business. Making sure everything from the ordering...
-
Nov 20, 20234 min read


Design Log : Test-Type : Asora v.01
Hooray! We've arrived at our current "Test-Type" design. Initially, my goal for the company was to have a soft launch in 2022....
-
Jan 18, 202310 min read


Design Log: Prototype : v.02 arrived.
I think all of the setups work. It will take me time to properly judge all of the setups and identify how to distribute the weight based...
-
Aug 28, 20222 min read


Design Log : Prototype : v.02
Over the months I played v1 quite extensively. I analyzed it, and compared it to my favorites, primarily the Metal Zero and MMC. (I...
-
Aug 28, 20226 min read


Design Log : Prototype : v.01
Welcome to the first entry into what should be many. This entry will cover the First prototype. We need to start from the beginning,...
-
Aug 23, 20229 min read
bottom of page